top of page

Weidmuller Electronic Load Monitoring


Modular systems for highly efficient implementation


Fail-safe and maintenance-friendly control voltage distributions that can be installed in a time- and space-saving manner are a must for efficient machine and facility operation. With the new load monitoring system, the terminal blocks (previously installed separately) for distributing potential to the outputs of the electronic load monitors become an integral part of a 24 V DC control voltage distribution solution. The new combination of load monitoring and potential distribution saves time during installation, increases safety against failure and reduces the amount of space required on the terminal rail by 50 %.



Our load monitoring product range


maxGUARD is breaking new ground in control voltage distribution. The combination of load monitoring elements and potential distribution terminals saves up to 50 % space and up to 20% time with wiring work, while the flexible compatibility of numerous single-channel and four-channel variations optimises material costs. maxGUARD offers you the benefits of a modular, highly flexible system that can be optimally adapted to any application.


topGUARD

The IO-Link-capable load monitoring system topGUARD offers remote control options, full data transparency, and reliable protection of the 24 V system voltage. It is an outstanding supplement to the IO-LINK-capable PROtop power supplies.

  • Data transparency and remote control due to IO-Link

  • Maximal flexibility thanks to a modular system

  • Voltage-adaptive load monitoring according to Class 2

  • Time and cost savings due to an integrated distribution of potential

  • Simple migration from maxGUARD to topGUARD



maxGUARD

Perfect for machines and systems: the fail-safe and maintenance-friendly maxGUARD system represents load monitoring and potential distribution all in one.

  • Modular, highly flexible system that can be optimally adapted to any application

  • Potential distributors with a 6.1 mm pitch ensure space-savings of up to 50 % on the rail

  • Time savings of up to 20 % due to unique cross-connectors between load monitoring and potential distribution terminals

  • Extreme ease of service during commissioning and maintenance

  • Practical disconnecting lever for simple galvanic isolation of the load circuit

bottom of page